CASE STUDY
Lothian Buses x Optimo

116
Connectors
6MVA
Power Supply
— Mo Ismail, Global Director of Sales, Optimo Energy
When a critical operator’s charging platform collapsed overnight, Edinburgh’s buses couldn’t wait.
Optimo replaced the entire system in 48 hours. Every bus pulled out on time.
Lothian Buses operates one of the UK’s most demanding urban bus networks. When the platform failed, the operational consequences were immediate and public.
Live system in days. Value in weeks. Revenue in months.
Optimo deployed on-site with one objective: full operational control within 48 hours, with no loss of charging capacity and no disruption to overnight operations. The transition was sequenced transformer by transformer, with every charger live on Optimo as it was reconfigured.
100% Vehicle Pull-Out Maintained | 48 Hours Full Site Transition | 109 Connectors Under Management

Operational stability was the immediate objective — but Optimo is an energy operating system, not a rescue platform. With the depot stable, Lothian can unlock the next layer of value from infrastructure they already own.
Most platforms take weeks to deploy. Optimo was live across a 109-connector depot in 48 hours — under emergency conditions, with the entire morning pull-out depending on the outcome.
Optimo mapped the full depot layout in hours. Every charging row was configured with its own scheduling logic and departure-order priority structure. Power is now distributed dynamically across the site with no manual overnight intervention.
© Copyright Optimo Energy Limited. All Rights Reserved.
